The estimated timeline for phase 2 is 12 months. However, new state of the art technologies and methodologies such as synchronised duplication will be used to expedite delivery in much shorter times than traditional methods yet not compromising on quality.
The estimated timeline to complete a typical house construction project using current traditional methods is 6 to 12 months, depending on the size, design, and location of the build. A typical general breakdown and common factors that could cause delays and some contingencies to mitigate risks are below:
🗓️ Estimated Timeline by Phase
| Phase | Duration |
|---|---|
| Planning & Design | 1–2 months |
| Permits & Pre-Construction | 1 month |
| Foundation | 2–4 weeks |
| Framing | 1–2 months |
| Mechanical, Electrical, Plumbing | 1–2 months |
| Insulation & Drywall | 2–4 weeks |
| Interior & Exterior Finishes | 2–3 months |
| Final Inspection & Handover | 2–4 weeks |
⚠️ Common Factors That Can Cause Delays
Weather Conditions – Rain, snow, or extreme temperatures can halt outdoor work like foundation and framing.
Permit or Inspection Delays – Waiting on approvals or failed inspections can slow progress.
Supply Chain Issues – Shortages or delays in materials (e.g. timber, appliances) impact timelines.
Labour Shortages – Skilled tradespeople may not be available when needed.
Design Changes – Mid-project modifications by the owner can reset parts of the schedule.
Budget Constraints – Pausing to secure additional funds can stall the project.
Site Challenges – Unforeseen issues like poor soil, grading, or existing infrastructure problems.
Contractor Delays – Poor scheduling or mismanagement by the builder can extend timelines.
Financing Delays – Delays in loan disbursements or payment processing.
✅ How we Stay on Track
We have a detailed project plan and timeline.
We already have experienced, reputable contractors.
We have direct relationships with key decision-makers in government etc to secure permits early.
We build in a buffer of 10–15% time for contingencies.
We maintain open communication with our project managers and builders throughout.